BrightVolt
  • Home
  • Electric Vehicles
        • Cars
        • Trucks
        • Motorcycles
        • e-bikes
        • Boats
        • Planes & Drones
        • Other
  • Renewable Energy
        • Wind
        • Solar
        • Hydro & Tidal
        • smartgrids
        • Home Electrification
  • Battery Technology
  • Charging & Infrastructure
  • Policy & Regulations
Select Page
Peaker Plants: Why the Grid’s Priciest Power Runs Least

Peaker Plants: Why the Grid’s Priciest Power Runs Least

Aug 15, 2026 | Renewable Energy, Smartgrids

A peaker plant is a power station built to sit idle. It earns its keep by running a few hours a year, on the evenings when demand spikes and everything cheaper is already maxed out — and that scarcity is exactly why it produces the most expensive electricity on the...
The BrightVolt Take: Utilities Want Your Home Battery Now

The BrightVolt Take: Utilities Want Your Home Battery Now

Aug 14, 2026 | Home Electrification, Renewable Energy, Smartgrids

Green Mountain Power spent this July doing something no utility did a decade ago: it dispatched 90 MW of home batteries during a heat wave, avoided the most expensive hour on the wholesale market, and saved every customer on its system $6 million — not just the ones...
Capacity Accreditation Explained: Why a 100 MW Wind Farm Counts as 34 MW

Capacity Accreditation Explained: Why a 100 MW Wind Farm Counts as 34 MW

Aug 14, 2026 | Renewable Energy, Smartgrids, Wind

Build a 100 MW wind farm in PJM and the grid will pay you for about 34 MW of it. The turbines are real, the nameplate is real, and the other 66 MW is not a penalty or an accounting trick. It is the grid’s estimate of how much of your wind farm it can count on...
The BrightVolt Take: Gas Didn’t Win the AI Power Race

The BrightVolt Take: Gas Didn’t Win the AI Power Race

Aug 7, 2026 | Renewable Energy, Smartgrids

Gas did not win the AI power race. In 2026 the US grid will add a record 86 GW of capacity, and 6.3 GW of it is natural gas — 7% of the total, behind solar, batteries and wind. The turbine order books everyone points to are real, but the first slots GE Vernova is...
The West Licenses Pumped Storage. China Builds It.

The West Licenses Pumped Storage. China Builds It.

Aug 2, 2026 | Hydro, Renewable Energy, Smartgrids

Global pumped storage capacity passed 201 GW in 2025, the first time it has cleared 200, on a record 11.7 GW of additions. There is 243 GW more under construction. China accounts for 218 GW of it — 90% of everything being built on the planet. North America, by...
The BrightVolt Take: Storage Just Overtook Wind on Winter

The BrightVolt Take: Storage Just Overtook Wind on Winter

Aug 1, 2026 | Renewable Energy, Smartgrids, Wind

In PJM’s 2026/27 capacity auction, onshore wind was credited at 41% of its nameplate rating and a four-hour battery at 50%. In the 2028/29 auction held this July, wind was credited at 34% and the battery at 59%. Storage has overtaken wind on the one measure wind...
« Older Entries
Next Entries »