We draw these ourselves, from primary sources, and check the figures against a second source before publishing. Take any of them: open the embed code under a chart and paste it into your page. It carries the credit link with it, and because it points at our copy of the file, a correction reaches your page too. Full terms .
What Britain adds each month. Electric cars outpace solar and batteries combined. Source: Ember, September 2026. Electrified Homes Shield UK Bills – but Not Evenly · 2026-09-26
Embed code
Fast growth, but concentrated: 60-plus of 650 constituencies, clustered where roofs and capital already are. Source: Ember. Electrified Homes Shield UK Bills – but Not Evenly · 2026-09-26
Embed code
Comparison diagram contrasting an electrified home and a gas-reliant home across upfront cost, what sets the bill, price-shock exposure and who it reaches Electrified Homes Shield UK Bills – but Not Evenly · 2026-09-26
Embed code
The adder is near zero while reserves are comfortable and jumps toward the $5,000/MWh cap as they approach the shortage point. Illustrative; ERCOT ORDC bands. Scarcity Pricing and the ORDC, Explained · 2026-09-26
Embed code
Flow diagram showing how a scarcity price is built: reserves fall below the minimum contingency level, loss-of-load probability rises, the adder equals LOLP times VOLL, it is added to the energy price, and idle plants and batteries earn in those hours Scarcity Pricing and the ORDC, Explained · 2026-09-26
Embed code
Texas cut the ceiling on scarcity prices after Winter Storm Uri. Source: S&P Global / PUCT. Scarcity Pricing and the ORDC, Explained · 2026-09-26
Embed code
Deliverable power, forecast against reality. The September dispatch overshot the programme’s own 2030 target. Source: BrightVolt (Aug 2026 estimate); Sunrun/Tesla (Sep 2026). The BrightVolt Take: The VPP Dispatch That Beat Our Forecast · 2026-09-26
Embed code
The headline number and the metered one measure different things. Source: Sunrun; CAISO. The BrightVolt Take: The VPP Dispatch That Beat Our Forecast · 2026-09-26
Embed code
PJM’s capacity price rose elevenfold in two years. Source: PJM; S&P Global; Enel North America. Energy-Only vs Capacity Markets: What Each Rewards · 2026-09-24
Embed code
Texas added batteries fastest in the US with no capacity payment. Source: Modo Energy. Energy-Only vs Capacity Markets: What Each Rewards · 2026-09-24
Embed code
Korea’s headline targets set against cells China is already shipping or piloting. The BrightVolt Take: Korea’s $6bn Battery Catch-Up · 2026-09-24
Embed code
The three Korean majors’ combined global share, against CATL alone. Source: SNE Research, via Korea Times and CnEVPost, 2021-2026. The BrightVolt Take: Korea’s $6bn Battery Catch-Up · 2026-09-24
Embed code
Comparison of physical curtailment, where the wires are full, against economic curtailment, where the market declines the power Renewable Curtailment: Why Grids Throw Away Clean Power · 2026-09-24
Embed code
The official rate counts dispatched-then-cut power; the higher estimate adds output suppressed upstream. Sources: China NEA; Global Energy Monitor and CREA, H1 2026. Renewable Curtailment: Why Grids Throw Away Clean Power · 2026-09-24
Embed code
For a five-metre SUV to use less energy than a Tesla Model 3 is the part that does not add up. Source: ev-database.org; BrightVolt calculation from Denza figures. Denza Z9S: The World’s Longest EV Range, Decoded · 2026-09-24
Embed code
Every WLTP figure is a flat 81% of its CLTC twin — a conversion, not a homologation. Source: CarNewsChina; Denza. Denza Z9S: The World’s Longest EV Range, Decoded · 2026-09-24
Embed code
US capacity thins sharply upstream of the module. Sources: SEIA / Wood Mackenzie, Solar Market Insight Q3 2026; Canary Media, 2026. US Solar Modules Hit 100 GW. The Cells Are Imported · 2026-09-22
Embed code
One thin-film maker is close to two-fifths of every module the US has ever built. Source: Terawatt PV Research, via pv magazine, 2026. US Solar Modules Hit 100 GW. The Cells Are Imported · 2026-09-22
Embed code
The crystalline silicon supply chain and where US capacity thins US Solar Modules Hit 100 GW. The Cells Are Imported · 2026-09-22
Embed code
CATL leads a table where seven of the top ten are Chinese. Source: SNE Research via CnEVPost. Captive vs Merchant Battery Makers, Explained · 2026-09-21
Embed code
Captive BYD grew 1.6% while merchant rivals surged. Source: SNE Research via CnEVPost. Captive vs Merchant Battery Makers, Explained · 2026-09-21
Embed code
The same percentage sign, two different businesses. Captive vs Merchant Battery Makers, Explained · 2026-09-21
Embed code
ERCOT now runs more battery power than CAISO. Source: Amperon; ERCOT/CAISO. The BrightVolt Take: How Texas Out-Built California on Batteries · 2026-09-21
Embed code
The Texas fleet near-doubled in a year. Source: Modo Energy; Amperon. The BrightVolt Take: How Texas Out-Built California on Batteries · 2026-09-21
Embed code
Two ways to grow a battery fleet. The BrightVolt Take: How Texas Out-Built California on Batteries · 2026-09-21
Embed code
Champion cell records run about ten points ahead of the modules that ship. Sources: NREL / LONGi; Nanjing University in Joule; Oxford PV; industry module data, 2026. Perovskite’s 27% Record and the Number That Ships · 2026-09-20
Embed code
The efficiency headline omits the axis that decides lifetime output. Sources: pv magazine (cell stability); Oxford PV; silicon module warranties. Perovskite’s 27% Record and the Number That Ships · 2026-09-20
Embed code
What separates a record cell from a panel you can buy Perovskite’s 27% Record and the Number That Ships · 2026-09-20
Embed code
Hybrids, not battery-electrics, led the EU market in H1 2026. Source: ACEA, H1 2026 registrations. The BrightVolt Take: Europe’s 30% EV Month Is One Month · 2026-09-18
Embed code
One month’s EV share, three ways of counting it. Sources: New Automotive / E-Mobility Europe; JATO Dynamics; ACEA, 2026. The BrightVolt Take: Europe’s 30% EV Month Is One Month · 2026-09-18
Embed code
Why the record and the official figure differ. Sources: New Automotive; ACEA; BrightVolt analysis. The BrightVolt Take: Europe’s 30% EV Month Is One Month · 2026-09-18
Embed code
Under the panels, the staples lost about a fifth of their yield; only the forage held up. Source: Fraunhofer ISE, Heggelbach 2017. Land Equivalent Ratio: The Number That Sells Agrivoltaics · 2026-09-18
Embed code
Two single-use baselines, each scoring on one axis and zero on the other, sum to a ratio above 1 almost by construction. Land Equivalent Ratio: The Number That Sells Agrivoltaics · 2026-09-18
Embed code
Truck charging blows past car charging. The MCS standard tops out at 3.75 MW; today’s trucks already draw 0.75-1.5 MW. Source: BrightVolt, from CharIN, MAN, Mercedes-Benz and BYD. *eActros 600 demonstrated. Electric Trucks Solved Range. Charging Is the New Wall. · 2026-09-16
Embed code
The range target was one legal driving day; megawatt charging turns the mandatory break into the refuel. Source: EU Regulation 561/2006 and manufacturer specs. Electric Trucks Solved Range. Charging Is the New Wall. · 2026-09-16
Embed code
Demand has sprinted away from a single-mill supply. Source: BrightVolt, from Wood Mackenzie (demand, 2019-25) and Burns & McDonnell (price). Grain-Oriented Steel: the Alloy the Grid Runs On · 2026-09-16
Embed code
Amorphous metal loses less energy but is brittle and suits only smaller units – it relieves the pressure on grain-oriented steel without replacing it. Source: BrightVolt, from US DOE and Cleveland-Cliffs. Grain-Oriented Steel: the Alloy the Grid Runs On · 2026-09-16
Embed code
LCOE prices a plant’s own output in isolation. The costs of turning that into reliable power sit outside the number. LCOE Explained: What the Cheapest-Power Number Leaves Out · 2026-09-15
Embed code
New wind and solar do not automatically beat the cost of running a plant that already exists. Figures are midpoints of Lazard’s 2026 ranges. Source: BrightVolt, from Lazard LCOE+ 2026. LCOE Explained: What the Cheapest-Power Number Leaves Out · 2026-09-15
Embed code
Peak charging power by charger type. Outside BYD’s own network, the fastest public tier is a quarter of its megawatt claim. Source: BrightVolt, from BYD and evchargingstations.com. BYD’s 9-Minute EV Charge Runs on a Battery, Not the Grid · 2026-09-15
Embed code
The nine-minute charge exists only where BYD has built the car, the charger and the buffer battery together. BYD’s 9-Minute EV Charge Runs on a Battery, Not the Grid · 2026-09-15
Embed code
Only 13% of US public DC connectors reach 350 kW. Source: BrightVolt, from evchargingstations.com, January 2026. BYD’s 9-Minute EV Charge Runs on a Battery, Not the Grid · 2026-09-15
Embed code
The adoption S-curve is bending over. China’s 2030 target of 70% sits just above August 2026’s record monthly 65.2%. Source: BrightVolt, from CPCA annual retail penetration data via CnEVPost and CarNewsChina. The BrightVolt Take: China’s EV Plan Is a Shakeout · 2026-09-14
Embed code
Record penetration on a shrinking market: NEV sales fell, but petrol sales fell ten times faster. Source: BrightVolt, from CPCA / industry data cited in the plan analysis. The BrightVolt Take: China’s EV Plan Is a Shakeout · 2026-09-14
Embed code
What changed in the 15th plan: the instruction flipped from build to consolidate. Source: BrightVolt analysis of the 15th Five-Year NEV plan. The BrightVolt Take: China’s EV Plan Is a Shakeout · 2026-09-14
Embed code
More clean power is waiting to connect than the US has power plants. Source: BrightVolt, from Lawrence Berkeley National Laboratory, Queued Up 2026 edition. Interconnection Queues: The Clean-Energy Bottleneck · 2026-09-14
Embed code
Seven of every eight gigawatts that joined a queue never connected. Source: BrightVolt, from LBNL Queued Up 2026. Interconnection Queues: The Clean-Energy Bottleneck · 2026-09-14
Embed code
The path from request to operation, now a median of more than five years. Source: BrightVolt, from FERC and LBNL. Interconnection Queues: The Clean-Energy Bottleneck · 2026-09-14
Embed code
The wasted clean power outran demand growth. Sources: CREA/Global Energy Monitor; China Electricity Council data, H1 2026. The BrightVolt Take: China’s Coal Is Contracted to Run · 2026-09-14
Embed code
Ten gigawatts of new coal for every one retired. Source: CREA/Global Energy Monitor, H1 2026 coal review. The BrightVolt Take: China’s Coal Is Contracted to Run · 2026-09-14
Embed code
Two rulebooks after Document 136. Sources: Carbon Brief; CREA; BrightVolt analysis. The BrightVolt Take: China’s Coal Is Contracted to Run · 2026-09-14
Embed code
Indicative cell-level energy density; manufacturer figures vary. Sources: Gotion; CATL; industry data. LMFP Batteries: What Manganese Adds to LFP · 2026-09-14
Embed code
LFP versus LMFP, attribute by attribute. Sources: manufacturer datasheets; BrightVolt analysis. LMFP Batteries: What Manganese Adds to LFP · 2026-09-14
Embed code
Texas added more new solar in six months than Arizona and Florida combined. Source: SEIA / Wood Mackenzie, Solar Market Insight Q3 2026. Red States Are Building 71% of New US Solar · 2026-09-12
Embed code
Solar’s share of the Texas grid tripled while coal’s fell by a third. Source: EIA, Today in Energy, May 2026. Red States Are Building 71% of New US Solar · 2026-09-12
Embed code
Where interconnection is fast and demand is exploding, the credit was a tailwind, not the foundation. Red States Are Building 71% of New US Solar · 2026-09-12
Embed code
Share of capacity versus share of generation. Source: EIA, preliminary 2025. Capacity Factor: Why 1 GW of Solar Isn’t 1 GW of Gas · 2026-09-12
Embed code
Share of nameplate each source delivers over a year. Sources: EIA Electric Power Monthly, ANS. Capacity Factor: Why 1 GW of Solar Isn’t 1 GW of Gas · 2026-09-12
Embed code
Why a zero-fuel technology is the one most exposed to the price of money. Source: BrightVolt, from IEA. Cost of Capital: Why It Sets the Price of Clean Power · 2026-09-09
Embed code
The same panels, financed at very different rates. Range midpoints; full ranges in the text. Source: IEA (2019 data). Cost of Capital: Why It Sets the Price of Clean Power · 2026-09-09
Embed code
The cheapest lever on the price of clean power. Source: BrightVolt. Cost of Capital: Why It Sets the Price of Clean Power · 2026-09-09
Embed code
CATL is booming on every line that carmakers cannot integrate away. Source: BrightVolt, from CATL H1 2026 results via Energy-Storage.News and SNE Research. The BrightVolt Take: CATL’s Customers Are Going In-House · 2026-09-09
Embed code
The slice thins even as the pie grows. Source: BrightVolt, from SNE Research and China battery-industry data via CnEVPost. The BrightVolt Take: CATL’s Customers Are Going In-House · 2026-09-09
Embed code
The choice a premium carmaker now makes. Source: BrightVolt analysis. The BrightVolt Take: CATL’s Customers Are Going In-House · 2026-09-09
Embed code
The two lines cross this month. Source: China Ministry of Finance & State Taxation Administration, via CnEVPost, 2026. The BrightVolt Take: China Taxed Lithium and Spared Sodium · 2026-09-07
Embed code
How the new tax splits the two chemistries. Source: BrightVolt analysis of Ministry of Finance and State Taxation Administration rules. The BrightVolt Take: China Taxed Lithium and Spared Sodium · 2026-09-07
Embed code
The two-way settlement that makes ‘subsidy’ the wrong word. Source: BrightVolt; IEA; Energy UK. Contracts for Difference: The Two-Way Clean-Power Deal · 2026-09-07
Embed code
The 2023 round (AR5) drew no offshore wind bids: the ceiling was set below developers’ real costs. Source: DESNZ/LCCC via Energy Voice. Contracts for Difference: The Two-Way Clean-Power Deal · 2026-09-07
Embed code
Cell-level gravimetric energy density, representative figures. Source: BrightVolt, from manufacturer specifications and TÜV testing. ProLogium Starts Solid-State Battery Mass Production · 2026-09-07
Embed code
Why ‘mass production’ is not yet automotive scale. Source: BrightVolt, from ProLogium. ProLogium Starts Solid-State Battery Mass Production · 2026-09-07
Embed code
System strength at Khavda ran below the CEA’s benchmark of 5 at all three pooling stations. Source: NRPC / CEA, via Renewable Watch, Aug 2026. India’s Grid-Forming Mandate Leans on a Storage Floor · 2026-09-04
Embed code
How 8,963 MW left the grid in sixteen seconds. Source: NRPC / CEA, via Renewable Watch. India’s Grid-Forming Mandate Leans on a Storage Floor · 2026-09-04
Embed code
The lines crossed inside a year. Source: BYD H1 2026 interim report; domestic = group total minus overseas. BYD Now Makes More Money Abroad Than in China · 2026-09-02
Embed code
Everything international is up; everything domestic is down. Source: BYD H1 2026 interim report; CnEVPost. BYD Now Makes More Money Abroad Than in China · 2026-09-02
Embed code
One company, two directions. Source: BYD H1 2026 interim report. BYD Now Makes More Money Abroad Than in China · 2026-09-02
Embed code
Power is the tap; energy is the tank. Source: BrightVolt. Power vs Energy: What GW and GWh Actually Mean · 2026-09-02
Embed code
How long each technology runs at full output. Sources: Ember, Dominion, Form Energy. Power vs Energy: What GW and GWh Actually Mean · 2026-09-02
Embed code
China’s battery fleet ran well below one cycle a day in 2025. Source: Ember, ‘From scale to system’, 2026. The BrightVolt Take: ‘Anytime Solar’ Is a Ceiling, Not a Fact · 2026-09-01
Embed code
A four-hour battery shifts hours, not months. Sources: Ember; BrightVolt analysis. The BrightVolt Take: ‘Anytime Solar’ Is a Ceiling, Not a Fact · 2026-09-01
Embed code
The 34% ceiling, unpacked by market. Source: Ember, ‘Batteries have unlocked the era of anytime solar’, 2026. The BrightVolt Take: ‘Anytime Solar’ Is a Ceiling, Not a Fact · 2026-09-01
Embed code
The ramp the first auction is meant to start. Source: Victorian Government; ABC News. Australia’s First Offshore Wind Auction: A 2 GW Long Bet · 2026-08-31
Embed code
Offshore wind costs more than double onshore, and was the only one of the three to rise in 2024. Source: IRENA, Renewable Power Generation Costs in 2024. Australia’s First Offshore Wind Auction: A 2 GW Long Bet · 2026-08-31
Embed code
From auction to electrons: why 2 GW put up in 2026 does nothing for the 2030 target. Australia’s First Offshore Wind Auction: A 2 GW Long Bet · 2026-08-31
Embed code
Volume-weighted average pack prices, 2025. A Western pack runs roughly double China’s. Source: BloombergNEF. The BrightVolt Take: CATL Just Made the Cell a Commodity · 2026-08-30
Embed code
Two ways to source an LFP cell in 2026. The US cell price applies Benchmark’s 56% premium to CATL’s list price. Sources: CATL, Benchmark Mineral Intelligence, BloombergNEF. The BrightVolt Take: CATL Just Made the Cell a Commodity · 2026-08-30
Embed code
Usable energy per kilogram, after engine and drivetrain losses. Source: CleanTechnica / M. Barnard. Why Electric Boats Are Harder Than Electric Cars · 2026-08-29
Embed code
Energy per kilometre. Foiling roughly triples a car’s appetite; a planing hull, about twelve times. Source: Candela figures; typical EV consumption; BrightVolt calculation. Why Electric Boats Are Harder Than Electric Cars · 2026-08-29
Embed code
The two vehicles share a battery problem but almost nothing else about how energy reaches the wheel or the water. Why Electric Boats Are Harder Than Electric Cars · 2026-08-29
Embed code
On power, grid batteries have nearly caught a technology a century older. Source: Rho Motion (batteries, end July 2026); International Hydropower Association (pumped storage, end 2025). Grid Batteries Are About to Pass Pumped Hydro on Power · 2026-08-29
Embed code
Batteries win on speed and deployment; pumped hydro still wins on energy and duration. The one thing they share is that China dominates both. Grid Batteries Are About to Pass Pumped Hydro on Power · 2026-08-29
Embed code
China installed 18.76 GW of grid storage in December 2025 alone — more than the US managed in the whole year. Source: Ember, from CNESA and the China Electricity Council. Grid Batteries Are About to Pass Pumped Hydro on Power · 2026-08-29
Embed code
The difference is whether the inverter follows the grid or sets it. Sources: UNIFI/NREL, AEMO. Grid-Forming vs Grid-Following Inverters, Explained · 2026-08-28
Embed code
Cost of buying system strength. Grid-forming batteries range AU$0-806/MWh/yr; the syncon figure is for a new build. Source: AEMO / Modo Energy assessments. Grid-Forming vs Grid-Following Inverters, Explained · 2026-08-28
Embed code
Lyten’s 14-month roll-up, with each site’s capacity. Sources: Lyten, Energy-Storage.News. The BrightVolt Take: Europe’s Battery Bet Sold for Scrap · 2026-08-28
Embed code
Capacity Lyten now controls. Ett is operational; Drei is under construction; Dwa is a BESS plant; Morrow never reached series production. Source: Lyten. The BrightVolt Take: Europe’s Battery Bet Sold for Scrap · 2026-08-28
Embed code
Natural gas still made nearly twice as much power as wind and solar combined. But wind and solar edged past nuclear. Source: EIA, via E&E News / National Law Review (H1 2026). US Wind and Solar Overtook Nuclear in the First Half of 2026 · 2026-08-27
Embed code
Solar did almost all of the growing; coal did all of the falling. Source: EIA Electric Power Monthly, first-half 2026 vs 2025. US Wind and Solar Overtook Nuclear in the First Half of 2026 · 2026-08-27
Embed code
The vehicles worth electrifying first burn the most and roam the least. Source: US DOE Alternative Fuels Data Center / FHWA Highway Statistics 2023. Why Mines and Ports Electrify Before Cars · 2026-08-27
Embed code
The same rule, twice: fixed route plus depot plus big fuel bill equals an early, unsubsidised switch. Why Mines and Ports Electrify Before Cars · 2026-08-27
Embed code
The record was a battery-and-solar record. Wind was a rounding error. Source: AEMO 2026 quarterly connections scorecard (June quarter). The BrightVolt Take: Australia’s Wind Gap Is the Real Story · 2026-08-26
Embed code
What the 82% target needs, what is coming, and what arrived. Source: AEMO 2026 Integrated System Plan; BloombergNEF. The BrightVolt Take: Australia’s Wind Gap Is the Real Story · 2026-08-26
Embed code
Why a market chasing records overbuilds the easy asset and underbuilds the one the grid needs. Source: AEMO FY26 connections scorecard; BloombergNEF. The BrightVolt Take: Australia’s Wind Gap Is the Real Story · 2026-08-26
Embed code
Sizing a home battery in four steps. How to Size a Home Battery That Actually Pays · 2026-08-25
Embed code
Residential electricity price by state. The spread, not the average, decides a battery’s value. Source: EIA via ChooseEnergy (2026). How to Size a Home Battery That Actually Pays · 2026-08-25
Embed code
Saudi grid-storage commitments by round. Sources: SPPC; Reuters; pv magazine. Saudi Arabia’s 8 GWh Battery Buy Is an Oil-Export Play · 2026-08-25
Embed code
All-in cost of four-hour storage by market. Saudi figure = $1.16bn ÷ 8 GWh. Sources: BloombergNEF (Dec 2025); SPPC/Reuters. Saudi Arabia’s 8 GWh Battery Buy Is an Oil-Export Play · 2026-08-25
Embed code
How a tolling contract differs from a merchant battery. Saudi Arabia’s 8 GWh Battery Buy Is an Oil-Export Play · 2026-08-25
Embed code
€12.6bn committed for 7 GW of seabed before a turbine was ordered. Source: German Federal Network Agency (BNetzA), July 2023. The BrightVolt Take: Negative Bidding Broke Offshore Wind · 2026-08-24
Embed code
The guaranteed price the UK’s CfD sets, by technology — the model Germany, Denmark and the Netherlands are moving back toward. Source: UK DESNZ, CfD AR8. The BrightVolt Take: Negative Bidding Broke Offshore Wind · 2026-08-24
Embed code
Same goal, opposite allocation of risk. Source: BNetzA; German BMWE; WindEurope. The BrightVolt Take: Negative Bidding Broke Offshore Wind · 2026-08-24
Embed code
Global EV-battery installations, January–May 2026. BYD sits a distant second and is losing ground. Source: SNE Research via CnEVPost. BYD’s Second-Gen Blade Battery Goes to Hongqi · 2026-08-23
Embed code
Two battery giants, two models. CATL sells to everyone; BYD, mostly to itself. Source: SNE Research; company disclosures. BYD’s Second-Gen Blade Battery Goes to Hongqi · 2026-08-23
Embed code
Wind and solar now sit second only to gas, above both nuclear and coal. Source: EIA Electric Power Monthly, H1 2026, via E&E News/POLITICO. The BrightVolt Take: Solar’s Record Half Is Already the Past · 2026-08-22
Embed code
Solar’s 19% jump against wind’s 5% is the tell — the modular, fast-to-start technology racing the construction deadline. Source: EIA. The BrightVolt Take: Solar’s Record Half Is Already the Past · 2026-08-22
Embed code
One date splits the industry into two futures. Source: IRS Notice 2025-42; OBBBA (P.L. 119-21). The BrightVolt Take: Solar’s Record Half Is Already the Past · 2026-08-22
Embed code
No chemistry, no cells — just water, gravity and a turbine that spins both ways. Sources: EIA; US Department of Energy. Pumped Storage: The Water Battery Nobody Counts · 2026-08-22
Embed code
Even after a sixfold battery build-out, pumped hydro is still roughly three times the installed power. Source: IEA, 2026. Pumped Storage: The Water Battery Nobody Counts · 2026-08-22
Embed code
More pumped storage is under construction than exists today, and the pipeline is three times the built fleet. Source: IHA 2026 World Hydropower Outlook. Pumped Storage: The Water Battery Nobody Counts · 2026-08-22
Embed code
The meter line decides ownership, dispatch and revenue — not the hardware, which can be identical cells on either side. Behind the Meter vs Front of Meter: What the Split Means · 2026-08-21
Embed code
The two sides of the meter are not the same size. Utility-scale storage still dwarfs residential, even as home installs grow fastest. Source: Wood Mackenzie / ACP, via pv magazine USA. Behind the Meter vs Front of Meter: What the Split Means · 2026-08-21
Embed code
LG Energy Solution made no US LFP before 2026. Holland added about 17 GWh; the company targets 50+ GWh across its North American plants by year’s end. Source: LG Energy Solution; BatteryTech Online; pv magazine USA. US-Made LFP Batteries Arrive as the Subsidies Vanish · 2026-08-21
Embed code
The policy shift removes the subsidy for a domestic cell but sharpens the penalty on the imported one. US-Made LFP Batteries Arrive as the Subsidies Vanish · 2026-08-21
Embed code
Four grids, one technology, opposite verdicts. Only Britain’s rulebook said no. The BrightVolt Take: The Grid Doesn’t Need Spinning Steel · 2026-08-20
Embed code
Where a market pays for the service or a grid cannot cope without it, grid-forming batteries get built at gigawatt scale. Sources: company announcements, Energy-Storage.News, pv magazine, 2026. The BrightVolt Take: The Grid Doesn’t Need Spinning Steel · 2026-08-20
Embed code
From standing start to half a million in thirteen months. Source: Clean Energy Regulator; SunWiz. Australia’s Home Batteries Hit 500,000 as US Credit Ends · 2026-08-19
Embed code
Solar and storage have become one purchase. Source: SunWiz; Clean Energy Regulator. Australia’s Home Batteries Hit 500,000 as US Credit Ends · 2026-08-19
Embed code
Same starting point, opposite policy, diverging results. Australia’s Home Batteries Hit 500,000 as US Credit Ends · 2026-08-19
Embed code
Same panels, same roof. The credit depends entirely on who owns the system. Source: OBBBA (P.L. 119-21), IRS Sections 25D and 48E. The BrightVolt Take: Buy Solar, Get 0%. Lease It, Get 40% · 2026-08-18
Embed code
Owning is on its way to becoming the minority. Source: Wood Mackenzie (2024 actual); Ohm Analytics (2026 forecast, midpoint shown). The BrightVolt Take: Buy Solar, Get 0%. Lease It, Get 40% · 2026-08-18
Embed code
The discount is real. So is what the household gives up to get it. The BrightVolt Take: Buy Solar, Get 0%. Lease It, Get 40% · 2026-08-18
Embed code
A four-hour battery and a hundred-hour battery are not two points on one scale. They answer to different buyers. Long-Duration Storage Found Its Buyer: AI Data Centers · 2026-08-17
Embed code
The three largest multi-day storage deals on record are all for data centers. Source: company announcements, 2026. Long-Duration Storage Found Its Buyer: AI Data Centers · 2026-08-17
Embed code
Demand for the units that connect new generation has almost quadrupled; large power transformers have more than doubled. Source: Wood Mackenzie. The BrightVolt Take: The Transformer Is the Real Bottleneck · 2026-08-16
Embed code
A GSU now takes close to three years to arrive. Source: Wood Mackenzie, Q2 2025. The BrightVolt Take: The Transformer Is the Real Bottleneck · 2026-08-16
Embed code
The domestic industry meant to replace imported transformers depends on a single mill making a grade the market has moved past. The BrightVolt Take: The Transformer Is the Real Bottleneck · 2026-08-16
Embed code
The 150 Nm everyone quotes is a 60-second boost. The number the bike sustains is 130. Source: Amflow. Amflow’s 2026 E-MTBs: Every Headline Number, Translated · 2026-08-16
Embed code
The lighter, dearer bike has the smaller battery, fixed in the frame. That is a choice, not an oversight. Amflow’s 2026 E-MTBs: Every Headline Number, Translated · 2026-08-16
Embed code
Amflow’s 144 km implies the motor contributing about 73 watts. Ask the M2S for everything and the same battery lasts 32 minutes. Source: BrightVolt calculation at a 15 km/h average. Amflow’s 2026 E-MTBs: Every Headline Number, Translated · 2026-08-16
Embed code
Quick for a bicycle, ordinary in C — and less than half what an unshipped competitor claims. Source: Amflow and Gobao figures. Amflow’s 2026 E-MTBs: Every Headline Number, Translated · 2026-08-16
Embed code
Neither new drive claims more gear than a 12-speed cassette. They claim the same gear with nothing hanging off the frame. Source: manufacturer figures. The Motor Ate the Gearbox: How eCVT E-Bike Drives Work · 2026-08-15
Embed code
The Prius transmission, shrunk, with your legs where the petrol engine goes. The Motor Ate the Gearbox: How eCVT E-Bike Drives Work · 2026-08-15
Embed code
The whole measured spread between the best chain and the worst hub gear is about eight kilometres. Source: BrightVolt calculation on a 750 Wh pack at 10 Wh/km. The Motor Ate the Gearbox: How eCVT E-Bike Drives Work · 2026-08-15
Embed code
Everything in the right-hand column except efficiency and price is a straight win. Those two are the whole argument. The Motor Ate the Gearbox: How eCVT E-Bike Drives Work · 2026-08-15
Embed code
Only a low-volume semi-solid pack and a record-breaking concept car beat the bicycle. Source: Battery Design teardown figures; Gobao claimed specification. Why an E-Bike Battery Beats a Car Battery on Energy Density · 2026-08-15
Embed code
The bicycle is denser because it is allowed to be simpler, not because it is more advanced. Why an E-Bike Battery Beats a Car Battery on Energy Density · 2026-08-15
Embed code
The jump to the top pack implies 150 extra watt-hours for 100 extra grams — a marginal density past what lithium-ion allows. Source: Gobao, via Velomotion. Why an E-Bike Battery Beats a Car Battery on Energy Density · 2026-08-15
Embed code
The same package at two power levels. Source: Gobao. Gobao’s Derailleur-Free Drive Published Its Numbers. One of Them Doesn’t Add Up · 2026-08-15
Embed code
Not a loophole. The EU limit is a continuous rating, and a motor that holds 250 W all day can give six times that for the seconds a steep pitch lasts. Source: Gobao. Gobao’s Derailleur-Free Drive Published Its Numbers. One of Them Doesn’t Add Up · 2026-08-15
Embed code
Roughly 1.7C. Most electric cars cannot hold the equivalent rate. Source: Gobao, via Velomotion. Gobao’s Derailleur-Free Drive Published Its Numbers. One of Them Doesn’t Add Up · 2026-08-15
Embed code
Both drives delete the derailleur. Only one of them tells you what it weighs. Source: figures released at Eurobike 2026. Avinox Showed a Gearbox Motor and Almost No Numbers · 2026-08-15
Embed code
Three of the four have not happened. The last one is where Pinion stalled. Avinox Showed a Gearbox Motor and Almost No Numbers · 2026-08-15
Embed code
Baseload gas runs thousands of hours a year; the peakers being retired run dozens. Hours derived from 2022 capacity factors. Source: EIA (fleet); CESA / Strategen (Maine plants). Peaker Plants: Why the Grid’s Priciest Power Runs Least · 2026-08-15
Embed code
Gas peaking is the most expensive new power on the system. Bars show range midpoints. Source: Lazard LCOE+ 2026. Peaker Plants: Why the Grid’s Priciest Power Runs Least · 2026-08-15
Embed code
The duty is identical. Everything else favours the battery. Peaker Plants: Why the Grid’s Priciest Power Runs Least · 2026-08-15
Embed code
The objection was never customer-sited power. It was undispatchable power. The BrightVolt Take: Utilities Want Your Home Battery Now · 2026-08-14
Embed code
One dispatch, thousands of basements. Source: Green Mountain Power, July 2026. The BrightVolt Take: Utilities Want Your Home Battery Now · 2026-08-14
Embed code
Power-plant numbers, built from hardware bought for other reasons. Source: Wood Mackenzie (2025); US DOE Liftoff target (2023). The BrightVolt Take: Utilities Want Your Home Battery Now · 2026-08-14
Embed code
Pre-order pricing, 13 August 2026. Source: CarNewsChina; CnEVPost. BYD Sealion 08: 900 km and a Nine-Minute Charge, Translated · 2026-08-14
Embed code
The claim is a window, not a curve. Expressed as a rate, it is remarkable. Source: BrightVolt calculation. BYD Sealion 08: 900 km and a Nine-Minute Charge, Translated · 2026-08-14
Embed code
The spread is enormous, and it depends on which hour the grid is worried about. Source: PJM class ratings; MISO. Capacity Accreditation Explained: Why a 100 MW Wind Farm Counts as 34 MW · 2026-08-14
Embed code
The turbines do not change. The revenue does. Capacity Accreditation Explained: Why a 100 MW Wind Farm Counts as 34 MW · 2026-08-14
Embed code
Nothing about wind got worse. There is simply more of it on the system. Source: PJM ELCC class ratings. Capacity Accreditation Explained: Why a 100 MW Wind Farm Counts as 34 MW · 2026-08-14
Embed code
Whether the headline rate is 102.5% or 127.5% depends entirely on the third bar. Source: US HTS; Section 301. Waymo Is Importing Chinese Robotaxis at Double Price. Here’s Why. · 2026-08-14
Embed code
Even at the higher tariff reading, the Zeekr lands at under half the cost of the Jaguar it replaces. Source: CarNewsChina; Forbes. Waymo Is Importing Chinese Robotaxis at Double Price. Here’s Why. · 2026-08-14
Embed code
The Arizona plant is not a cost decision. It is the exit from a regulatory deadline. Waymo Is Importing Chinese Robotaxis at Double Price. Here’s Why. · 2026-08-14
Embed code
The same month, three ways. Source: CAAM and CPCA, via CnEVPost. The BrightVolt Take: China’s EV Growth Is All Exports Now · 2026-08-13
Embed code
Two official scoreboards, one market. The BrightVolt Take: China’s EV Growth Is All Exports Now · 2026-08-13
Embed code
Domestic sales down ~12%, exports up 120%. Source: CAAM, via CnEVPost; 2025 back-calculated from reported year-on-year changes. The BrightVolt Take: China’s EV Growth Is All Exports Now · 2026-08-13
Embed code
The 2027 milestone and the product are not the same event. Source: CATL and BYD statements, 2026. The BrightVolt Take: Solid-State’s 2027 Is Not a Car · 2026-08-12
Embed code
The payoff is real: roughly 40% more energy per kilogram. The price is the problem. Source: CATL; industry cell figures. The BrightVolt Take: Solid-State’s 2027 Is Not a Car · 2026-08-12
Embed code
Why the first cells go into flagships, not hatchbacks. Source: CATL, via electrive. The BrightVolt Take: Solid-State’s 2027 Is Not a Car · 2026-08-12
Embed code
A scooter swap needs no cable, no robot and no wait. Source: Gogoro. Why Battery Swapping Works for Scooters, Not Cars · 2026-08-12
Embed code
The single number that decides the economics. Source: Gogoro; typical EV pack. Why Battery Swapping Works for Scooters, Not Cars · 2026-08-12
Embed code
Natron tried to out-build sodium’s density problem. Peak designed around it. Source: IEEE Spectrum; Canary Media. US Sodium-Ion Bets on the Grid, Not the Car · 2026-08-12
Embed code
Sodium’s optimistic ceiling lands where LFP already sits. Source: pv magazine; CATL; battery.mba. US Sodium-Ion Bets on the Grid, Not the Car · 2026-08-12
Embed code
Intercalation stores charge; plating deposits metal. The difference is about a tenth of a volt. Lithium Plating: Why Fast Charging Degrades Batteries · 2026-08-10
Embed code
Most fast charges never reach the end of this chain. Design aims to break it at the first link. Lithium Plating: Why Fast Charging Degrades Batteries · 2026-08-10
Embed code
The 5.8 GW RWE walked away from. Source: RWE lease filings via Maritime Executive. The US Is Paying $4 Billion to Cancel Offshore Wind · 2026-08-10
Embed code
The buyback cheque and the gas cheque are the same size. Source: Fortune; Maritime Executive. The US Is Paying $4 Billion to Cancel Offshore Wind · 2026-08-10
Embed code
How the buyback empties the offshore pipeline. Source: US Department of the Interior. The US Is Paying $4 Billion to Cancel Offshore Wind · 2026-08-10
Embed code
What actually comes online in 2026. Gas is 7% of it. Source: EIA Short-Term Energy Outlook, 2026. The BrightVolt Take: Gas Didn’t Win the AI Power Race · 2026-08-07
Embed code
The backlog grows while delivery dates slide to 2031. Source: GE Vernova Q2 2026 results, via Utility Dive. The BrightVolt Take: Gas Didn’t Win the AI Power Race · 2026-08-07
Embed code
Rate and charging time are the same fact stated two ways: time equals one divided by C. What C-Rate Tells You About How Fast an EV Charges · 2026-08-07
Embed code
The headline C-rate is the height of the spike, not the area under the curve. What C-Rate Tells You About How Fast an EV Charges · 2026-08-07
Embed code
How much of the average wholesale price solar earned, April 2026. Source: Pexapark via pv magazine, 13 May 2026. Solar Capture Rate Explained: Why More Solar Earns Less · 2026-08-04
Embed code
The merit-order effect: solar depresses the price in exactly the hours it sells into. Solar Capture Rate Explained: Why More Solar Earns Less · 2026-08-04
Embed code
Heat pumps sold per 1,000 households in 2024, by country The BrightVolt Take: Heat Pumps Sell on the Price Ratio · 2026-08-03
Embed code
European heat pump sales, year-on-year change The BrightVolt Take: Heat Pumps Sell on the Price Ratio · 2026-08-03
Embed code
Combined system output as claimed by each manufacturer. Sources: CnEVPost; CarNewsChina; Denza. 1,113 Horsepower, 185 km of Range, and One of Those Numbers Is CLTC · 2026-08-02
Embed code
CLTC as published, against an EPA-equivalent estimate using the 26% haircut from our range-cycle explainer. The right-hand bars are our arithmetic, not Geely’s. 1,113 Horsepower, 185 km of Range, and One of Those Numbers Is CLTC · 2026-08-02
Embed code
One measured session, January 2026. Source: EV Charging Stations DC fast charging analysis. Why a 350 kW Charger Never Gives You 350 kW · 2026-08-02
Embed code
Amps needed for 350 kW. A CCS plug handles about 500 A continuously. Why a 350 kW Charger Never Gives You 350 kW · 2026-08-02
Embed code
What happens across a session. Sources: evkx.net; World Electric Vehicle Journal, August 2024. Why a 350 kW Charger Never Gives You 350 kW · 2026-08-02
Embed code
The standard against the hardware. Sources: CharIN; Milence; electrive, 30 July 2026. Why a 350 kW Charger Never Gives You 350 kW · 2026-08-02
Embed code
Solar capture factors, April year on year. Source: Pexapark via pv magazine, 13 May 2026. The BrightVolt Take: Europe’s Solar Problem Is Value · 2026-08-02
Embed code
Volume up, value down. Sources: Ember; SolarPower Europe; Kpler; LevelTen Energy. The BrightVolt Take: Europe’s Solar Problem Is Value · 2026-08-02
Embed code
Heavy truck electrification, 2025. Denominators differ by market. Sources: CVWorld via CnEVPost; ACEA; CALSTART. Europe Sold 4,991 Electric Trucks. China Sold 231,100. · 2026-08-02
Embed code
TCO gap against diesel long-haul, 2026. Source: ICCT, April 2026. Europe Sold 4,991 Electric Trucks. China Sold 231,100. · 2026-08-02
Embed code
China’s H1 2026 generation mix. Source: National Energy Administration, 30 July 2026. China’s Coal Share Fell Below Half. Coal Still Grew. · 2026-08-02
Embed code
New solar capacity, first half. Source: National Energy Administration, released 22 July 2026. China’s Coal Share Fell Below Half. Coal Still Grew. · 2026-08-02
Embed code
Yield under panels against open field. Source: Energies 19(2) 539, 2026 systematic review. Agrivoltaics: What 320 Experiments Actually Found · 2026-08-02
Embed code
Capex and electricity yield by mounting type. Source: Energieagentur Rheinland-Pfalz, January 2026. Agrivoltaics: What 320 Experiments Actually Found · 2026-08-02
Embed code
Pumped storage under construction, end 2025. Source: IHA World Hydropower Outlook 2026. The West Licenses Pumped Storage. China Builds It. · 2026-08-02
Embed code
Capital cost per kWh of storage. Fengning and Goldendale derived from published capex; not inflation-harmonised. Sources: State Grid; Rye Development; Lazard LCOE+ June 2025. The West Licenses Pumped Storage. China Builds It. · 2026-08-02
Embed code
Denza Z Coupe pricing, China against the United Kingdom BYD’s Denza Z Costs 88% More in Britain Than China · 2026-08-01
Embed code
Leapmotor B-series range by trim Leapmotor Just Broke the 800V Price Floor · 2026-08-01
Embed code
Battery attachment rate on new residential solar Net Metering Is Ending. Homeowners Are Buying Batteries. · 2026-08-01
Embed code
US residential solar installations by year Net Metering Is Ending. Homeowners Are Buying Batteries. · 2026-08-01
Embed code
The two estimates of California's 2024 rooftop solar cost shift Net Metering Is Ending. Homeowners Are Buying Batteries. · 2026-08-01
Embed code
Gravimetric energy density by cell chemistry Sodium-Ion Batteries: Why They Won’t Replace Lithium · 2026-08-01
Embed code
Sodium-ion against LFP on the attributes that decide deployment Sodium-Ion Batteries: Why They Won’t Replace Lithium · 2026-08-01
Embed code
Announced sodium-ion capacity against what is actually operating Sodium-Ion Batteries: Why They Won’t Replace Lithium · 2026-08-01
Embed code
Battery-grade lithium carbonate, China spot. Sources: Benchmark Mineral Intelligence; Gasgoo; Trading Economics. Sodium-Ion Batteries: Why They Won’t Replace Lithium · 2026-08-01
Embed code
Onshore wind down seven points, four-hour storage up nine. Source: PJM BRA ELCC class ratings, 2026/27 to 2028/29. The BrightVolt Take: Storage Just Overtook Wind on Winter · 2026-08-01
Embed code
PJM’s preliminary class ratings, which the operator labels non-binding and indicative only. Source: PJM. The BrightVolt Take: Storage Just Overtook Wind on Winter · 2026-08-01
Embed code
Onshore turbine prices, West against China The BrightVolt Take: Storage Just Overtook Wind on Winter · 2026-08-01
Embed code
Electric range on the CLTC cycle against usable battery. Sources: CarNewsChina and CnEVPost, 30 July 2026; CnEVPost, 16 July 2026. Xiaomi’s SkyNomad Isn’t Electric, and Isn’t a Brand · 2026-08-01
Embed code
Electric range on the CLTC cycle against usable battery. Sources: CarNewsChina and CnEVPost, 30 July 2026; CnEVPost, 16 July 2026. Solar and Storage Are 79% of New US Grid Capacity in 2026 · 2026-07-31
Embed code
Solar capture factors, April year on year. Source: Pexapark via pv magazine, 13 May 2026. Japan’s First 300km Electric Kei Car Is Chinese · 2026-07-31
Embed code
China’s H1 2026 generation mix. Source: National Energy Administration, 30 July 2026. EV Range Explained: Why CLTC, WLTP and EPA Disagree · 2026-07-30
Embed code
Active capacity in the US interconnection queue by technology, end of 2025 The BrightVolt Take: Solar Isn’t the Bottleneck. The Queue Is. · 2026-07-30
Embed code
Median months from interconnection request to commercial operation, 2008 to 2025 The BrightVolt Take: Solar Isn’t the Bottleneck. The Queue Is. · 2026-07-30
Embed code
Year-over-year change in US battery-electric vehicle sales, Q4 2025 through Q2 2026 US EV Sales Q2 2026: Decline Slows as Hybrids Take Over · 2026-07-30
Embed code
Year-over-year change in US retail sales by powertrain, Q2 2026 US EV Sales Q2 2026: Decline Slows as Hybrids Take Over · 2026-07-30