We draw these ourselves, from primary sources, and check the figures against a second source before publishing. Take any of them: open the embed code under a chart and paste it into your page. It carries the credit link with it, and because it points at our copy of the file, a correction reaches your page too. Full terms .
System strength at Khavda ran below the CEA’s benchmark of 5 at all three pooling stations. Source: NRPC / CEA, via Renewable Watch, Aug 2026. India’s Grid-Forming Mandate Leans on a Storage Floor · 2026-09-04
Embed code
How 8,963 MW left the grid in sixteen seconds. Source: NRPC / CEA, via Renewable Watch. India’s Grid-Forming Mandate Leans on a Storage Floor · 2026-09-04
Embed code
The lines crossed inside a year. Source: BYD H1 2026 interim report; domestic = group total minus overseas. BYD Now Makes More Money Abroad Than in China · 2026-09-02
Embed code
Everything international is up; everything domestic is down. Source: BYD H1 2026 interim report; CnEVPost. BYD Now Makes More Money Abroad Than in China · 2026-09-02
Embed code
One company, two directions. Source: BYD H1 2026 interim report. BYD Now Makes More Money Abroad Than in China · 2026-09-02
Embed code
Power is the tap; energy is the tank. Source: BrightVolt. Power vs Energy: What GW and GWh Actually Mean · 2026-09-02
Embed code
How long each technology runs at full output. Sources: Ember, Dominion, Form Energy. Power vs Energy: What GW and GWh Actually Mean · 2026-09-02
Embed code
China’s battery fleet ran well below one cycle a day in 2025. Source: Ember, ‘From scale to system’, 2026. The BrightVolt Take: ‘Anytime Solar’ Is a Ceiling, Not a Fact · 2026-09-01
Embed code
A four-hour battery shifts hours, not months. Sources: Ember; BrightVolt analysis. The BrightVolt Take: ‘Anytime Solar’ Is a Ceiling, Not a Fact · 2026-09-01
Embed code
The 34% ceiling, unpacked by market. Source: Ember, ‘Batteries have unlocked the era of anytime solar’, 2026. The BrightVolt Take: ‘Anytime Solar’ Is a Ceiling, Not a Fact · 2026-09-01
Embed code
The ramp the first auction is meant to start. Source: Victorian Government; ABC News. Australia’s First Offshore Wind Auction: A 2 GW Long Bet · 2026-08-31
Embed code
Offshore wind costs more than double onshore, and was the only one of the three to rise in 2024. Source: IRENA, Renewable Power Generation Costs in 2024. Australia’s First Offshore Wind Auction: A 2 GW Long Bet · 2026-08-31
Embed code
From auction to electrons: why 2 GW put up in 2026 does nothing for the 2030 target. Australia’s First Offshore Wind Auction: A 2 GW Long Bet · 2026-08-31
Embed code
Volume-weighted average pack prices, 2025. A Western pack runs roughly double China’s. Source: BloombergNEF. The BrightVolt Take: CATL Just Made the Cell a Commodity · 2026-08-30
Embed code
Two ways to source an LFP cell in 2026. The US cell price applies Benchmark’s 56% premium to CATL’s list price. Sources: CATL, Benchmark Mineral Intelligence, BloombergNEF. The BrightVolt Take: CATL Just Made the Cell a Commodity · 2026-08-30
Embed code
Usable energy per kilogram, after engine and drivetrain losses. Source: CleanTechnica / M. Barnard. Why Electric Boats Are Harder Than Electric Cars · 2026-08-29
Embed code
Energy per kilometre. Foiling roughly triples a car’s appetite; a planing hull, about twelve times. Source: Candela figures; typical EV consumption; BrightVolt calculation. Why Electric Boats Are Harder Than Electric Cars · 2026-08-29
Embed code
The two vehicles share a battery problem but almost nothing else about how energy reaches the wheel or the water. Why Electric Boats Are Harder Than Electric Cars · 2026-08-29
Embed code
On power, grid batteries have nearly caught a technology a century older. Source: Rho Motion (batteries, end July 2026); International Hydropower Association (pumped storage, end 2025). Grid Batteries Are About to Pass Pumped Hydro on Power · 2026-08-29
Embed code
Batteries win on speed and deployment; pumped hydro still wins on energy and duration. The one thing they share is that China dominates both. Grid Batteries Are About to Pass Pumped Hydro on Power · 2026-08-29
Embed code
China installed 18.76 GW of grid storage in December 2025 alone — more than the US managed in the whole year. Source: Ember, from CNESA and the China Electricity Council. Grid Batteries Are About to Pass Pumped Hydro on Power · 2026-08-29
Embed code
The difference is whether the inverter follows the grid or sets it. Sources: UNIFI/NREL, AEMO. Grid-Forming vs Grid-Following Inverters, Explained · 2026-08-28
Embed code
Cost of buying system strength. Grid-forming batteries range AU$0-806/MWh/yr; the syncon figure is for a new build. Source: AEMO / Modo Energy assessments. Grid-Forming vs Grid-Following Inverters, Explained · 2026-08-28
Embed code
Lyten’s 14-month roll-up, with each site’s capacity. Sources: Lyten, Energy-Storage.News. The BrightVolt Take: Europe’s Battery Bet Sold for Scrap · 2026-08-28
Embed code
Capacity Lyten now controls. Ett is operational; Drei is under construction; Dwa is a BESS plant; Morrow never reached series production. Source: Lyten. The BrightVolt Take: Europe’s Battery Bet Sold for Scrap · 2026-08-28
Embed code
Natural gas still made nearly twice as much power as wind and solar combined. But wind and solar edged past nuclear. Source: EIA, via E&E News / National Law Review (H1 2026). US Wind and Solar Overtook Nuclear in the First Half of 2026 · 2026-08-27
Embed code
Solar did almost all of the growing; coal did all of the falling. Source: EIA Electric Power Monthly, first-half 2026 vs 2025. US Wind and Solar Overtook Nuclear in the First Half of 2026 · 2026-08-27
Embed code
The vehicles worth electrifying first burn the most and roam the least. Source: US DOE Alternative Fuels Data Center / FHWA Highway Statistics 2023. Why Mines and Ports Electrify Before Cars · 2026-08-27
Embed code
The same rule, twice: fixed route plus depot plus big fuel bill equals an early, unsubsidised switch. Why Mines and Ports Electrify Before Cars · 2026-08-27
Embed code
The record was a battery-and-solar record. Wind was a rounding error. Source: AEMO 2026 quarterly connections scorecard (June quarter). The BrightVolt Take: Australia’s Wind Gap Is the Real Story · 2026-08-26
Embed code
What the 82% target needs, what is coming, and what arrived. Source: AEMO 2026 Integrated System Plan; BloombergNEF. The BrightVolt Take: Australia’s Wind Gap Is the Real Story · 2026-08-26
Embed code
Why a market chasing records overbuilds the easy asset and underbuilds the one the grid needs. Source: AEMO FY26 connections scorecard; BloombergNEF. The BrightVolt Take: Australia’s Wind Gap Is the Real Story · 2026-08-26
Embed code
Sizing a home battery in four steps. How to Size a Home Battery That Actually Pays · 2026-08-25
Embed code
Residential electricity price by state. The spread, not the average, decides a battery’s value. Source: EIA via ChooseEnergy (2026). How to Size a Home Battery That Actually Pays · 2026-08-25
Embed code
Saudi grid-storage commitments by round. Sources: SPPC; Reuters; pv magazine. Saudi Arabia’s 8 GWh Battery Buy Is an Oil-Export Play · 2026-08-25
Embed code
All-in cost of four-hour storage by market. Saudi figure = $1.16bn ÷ 8 GWh. Sources: BloombergNEF (Dec 2025); SPPC/Reuters. Saudi Arabia’s 8 GWh Battery Buy Is an Oil-Export Play · 2026-08-25
Embed code
How a tolling contract differs from a merchant battery. Saudi Arabia’s 8 GWh Battery Buy Is an Oil-Export Play · 2026-08-25
Embed code
€12.6bn committed for 7 GW of seabed before a turbine was ordered. Source: German Federal Network Agency (BNetzA), July 2023. The BrightVolt Take: Negative Bidding Broke Offshore Wind · 2026-08-24
Embed code
The guaranteed price the UK’s CfD sets, by technology — the model Germany, Denmark and the Netherlands are moving back toward. Source: UK DESNZ, CfD AR8. The BrightVolt Take: Negative Bidding Broke Offshore Wind · 2026-08-24
Embed code
Same goal, opposite allocation of risk. Source: BNetzA; German BMWE; WindEurope. The BrightVolt Take: Negative Bidding Broke Offshore Wind · 2026-08-24
Embed code
Global EV-battery installations, January–May 2026. BYD sits a distant second and is losing ground. Source: SNE Research via CnEVPost. BYD’s Second-Gen Blade Battery Goes to Hongqi · 2026-08-23
Embed code
Two battery giants, two models. CATL sells to everyone; BYD, mostly to itself. Source: SNE Research; company disclosures. BYD’s Second-Gen Blade Battery Goes to Hongqi · 2026-08-23
Embed code
Wind and solar now sit second only to gas, above both nuclear and coal. Source: EIA Electric Power Monthly, H1 2026, via E&E News/POLITICO. The BrightVolt Take: Solar’s Record Half Is Already the Past · 2026-08-22
Embed code
Solar’s 19% jump against wind’s 5% is the tell — the modular, fast-to-start technology racing the construction deadline. Source: EIA. The BrightVolt Take: Solar’s Record Half Is Already the Past · 2026-08-22
Embed code
One date splits the industry into two futures. Source: IRS Notice 2025-42; OBBBA (P.L. 119-21). The BrightVolt Take: Solar’s Record Half Is Already the Past · 2026-08-22
Embed code
No chemistry, no cells — just water, gravity and a turbine that spins both ways. Sources: EIA; US Department of Energy. Pumped Storage: The Water Battery Nobody Counts · 2026-08-22
Embed code
Even after a sixfold battery build-out, pumped hydro is still roughly three times the installed power. Source: IEA, 2026. Pumped Storage: The Water Battery Nobody Counts · 2026-08-22
Embed code
More pumped storage is under construction than exists today, and the pipeline is three times the built fleet. Source: IHA 2026 World Hydropower Outlook. Pumped Storage: The Water Battery Nobody Counts · 2026-08-22
Embed code
The meter line decides ownership, dispatch and revenue — not the hardware, which can be identical cells on either side. Behind the Meter vs Front of Meter: What the Split Means · 2026-08-21
Embed code
The two sides of the meter are not the same size. Utility-scale storage still dwarfs residential, even as home installs grow fastest. Source: Wood Mackenzie / ACP, via pv magazine USA. Behind the Meter vs Front of Meter: What the Split Means · 2026-08-21
Embed code
LG Energy Solution made no US LFP before 2026. Holland added about 17 GWh; the company targets 50+ GWh across its North American plants by year’s end. Source: LG Energy Solution; BatteryTech Online; pv magazine USA. US-Made LFP Batteries Arrive as the Subsidies Vanish · 2026-08-21
Embed code
The policy shift removes the subsidy for a domestic cell but sharpens the penalty on the imported one. US-Made LFP Batteries Arrive as the Subsidies Vanish · 2026-08-21
Embed code
Four grids, one technology, opposite verdicts. Only Britain’s rulebook said no. The BrightVolt Take: The Grid Doesn’t Need Spinning Steel · 2026-08-20
Embed code
Where a market pays for the service or a grid cannot cope without it, grid-forming batteries get built at gigawatt scale. Sources: company announcements, Energy-Storage.News, pv magazine, 2026. The BrightVolt Take: The Grid Doesn’t Need Spinning Steel · 2026-08-20
Embed code
From standing start to half a million in thirteen months. Source: Clean Energy Regulator; SunWiz. Australia’s Home Batteries Hit 500,000 as US Credit Ends · 2026-08-19
Embed code
Solar and storage have become one purchase. Source: SunWiz; Clean Energy Regulator. Australia’s Home Batteries Hit 500,000 as US Credit Ends · 2026-08-19
Embed code
Same starting point, opposite policy, diverging results. Australia’s Home Batteries Hit 500,000 as US Credit Ends · 2026-08-19
Embed code
Same panels, same roof. The credit depends entirely on who owns the system. Source: OBBBA (P.L. 119-21), IRS Sections 25D and 48E. The BrightVolt Take: Buy Solar, Get 0%. Lease It, Get 40% · 2026-08-18
Embed code
Owning is on its way to becoming the minority. Source: Wood Mackenzie (2024 actual); Ohm Analytics (2026 forecast, midpoint shown). The BrightVolt Take: Buy Solar, Get 0%. Lease It, Get 40% · 2026-08-18
Embed code
The discount is real. So is what the household gives up to get it. The BrightVolt Take: Buy Solar, Get 0%. Lease It, Get 40% · 2026-08-18
Embed code
A four-hour battery and a hundred-hour battery are not two points on one scale. They answer to different buyers. Long-Duration Storage Found Its Buyer: AI Data Centers · 2026-08-17
Embed code
The three largest multi-day storage deals on record are all for data centers. Source: company announcements, 2026. Long-Duration Storage Found Its Buyer: AI Data Centers · 2026-08-17
Embed code
Demand for the units that connect new generation has almost quadrupled; large power transformers have more than doubled. Source: Wood Mackenzie. The BrightVolt Take: The Transformer Is the Real Bottleneck · 2026-08-16
Embed code
A GSU now takes close to three years to arrive. Source: Wood Mackenzie, Q2 2025. The BrightVolt Take: The Transformer Is the Real Bottleneck · 2026-08-16
Embed code
The domestic industry meant to replace imported transformers depends on a single mill making a grade the market has moved past. The BrightVolt Take: The Transformer Is the Real Bottleneck · 2026-08-16
Embed code
The 150 Nm everyone quotes is a 60-second boost. The number the bike sustains is 130. Source: Amflow. Amflow’s 2026 E-MTBs: Every Headline Number, Translated · 2026-08-16
Embed code
The lighter, dearer bike has the smaller battery, fixed in the frame. That is a choice, not an oversight. Amflow’s 2026 E-MTBs: Every Headline Number, Translated · 2026-08-16
Embed code
Amflow’s 144 km implies the motor contributing about 73 watts. Ask the M2S for everything and the same battery lasts 32 minutes. Source: BrightVolt calculation at a 15 km/h average. Amflow’s 2026 E-MTBs: Every Headline Number, Translated · 2026-08-16
Embed code
Quick for a bicycle, ordinary in C — and less than half what an unshipped competitor claims. Source: Amflow and Gobao figures. Amflow’s 2026 E-MTBs: Every Headline Number, Translated · 2026-08-16
Embed code
Neither new drive claims more gear than a 12-speed cassette. They claim the same gear with nothing hanging off the frame. Source: manufacturer figures. The Motor Ate the Gearbox: How eCVT E-Bike Drives Work · 2026-08-15
Embed code
The Prius transmission, shrunk, with your legs where the petrol engine goes. The Motor Ate the Gearbox: How eCVT E-Bike Drives Work · 2026-08-15
Embed code
The whole measured spread between the best chain and the worst hub gear is about eight kilometres. Source: BrightVolt calculation on a 750 Wh pack at 10 Wh/km. The Motor Ate the Gearbox: How eCVT E-Bike Drives Work · 2026-08-15
Embed code
Everything in the right-hand column except efficiency and price is a straight win. Those two are the whole argument. The Motor Ate the Gearbox: How eCVT E-Bike Drives Work · 2026-08-15
Embed code
Only a low-volume semi-solid pack and a record-breaking concept car beat the bicycle. Source: Battery Design teardown figures; Gobao claimed specification. Why an E-Bike Battery Beats a Car Battery on Energy Density · 2026-08-15
Embed code
The bicycle is denser because it is allowed to be simpler, not because it is more advanced. Why an E-Bike Battery Beats a Car Battery on Energy Density · 2026-08-15
Embed code
The jump to the top pack implies 150 extra watt-hours for 100 extra grams — a marginal density past what lithium-ion allows. Source: Gobao, via Velomotion. Why an E-Bike Battery Beats a Car Battery on Energy Density · 2026-08-15
Embed code
The same package at two power levels. Source: Gobao. Gobao’s Derailleur-Free Drive Published Its Numbers. One of Them Doesn’t Add Up · 2026-08-15
Embed code
Not a loophole. The EU limit is a continuous rating, and a motor that holds 250 W all day can give six times that for the seconds a steep pitch lasts. Source: Gobao. Gobao’s Derailleur-Free Drive Published Its Numbers. One of Them Doesn’t Add Up · 2026-08-15
Embed code
Roughly 1.7C. Most electric cars cannot hold the equivalent rate. Source: Gobao, via Velomotion. Gobao’s Derailleur-Free Drive Published Its Numbers. One of Them Doesn’t Add Up · 2026-08-15
Embed code
Both drives delete the derailleur. Only one of them tells you what it weighs. Source: figures released at Eurobike 2026. Avinox Showed a Gearbox Motor and Almost No Numbers · 2026-08-15
Embed code
Three of the four have not happened. The last one is where Pinion stalled. Avinox Showed a Gearbox Motor and Almost No Numbers · 2026-08-15
Embed code
Baseload gas runs thousands of hours a year; the peakers being retired run dozens. Hours derived from 2022 capacity factors. Source: EIA (fleet); CESA / Strategen (Maine plants). Peaker Plants: Why the Grid’s Priciest Power Runs Least · 2026-08-15
Embed code
Gas peaking is the most expensive new power on the system. Bars show range midpoints. Source: Lazard LCOE+ 2026. Peaker Plants: Why the Grid’s Priciest Power Runs Least · 2026-08-15
Embed code
The duty is identical. Everything else favours the battery. Peaker Plants: Why the Grid’s Priciest Power Runs Least · 2026-08-15
Embed code
The objection was never customer-sited power. It was undispatchable power. The BrightVolt Take: Utilities Want Your Home Battery Now · 2026-08-14
Embed code
One dispatch, thousands of basements. Source: Green Mountain Power, July 2026. The BrightVolt Take: Utilities Want Your Home Battery Now · 2026-08-14
Embed code
Power-plant numbers, built from hardware bought for other reasons. Source: Wood Mackenzie (2025); US DOE Liftoff target (2023). The BrightVolt Take: Utilities Want Your Home Battery Now · 2026-08-14
Embed code
Pre-order pricing, 13 August 2026. Source: CarNewsChina; CnEVPost. BYD Sealion 08: 900 km and a Nine-Minute Charge, Translated · 2026-08-14
Embed code
The claim is a window, not a curve. Expressed as a rate, it is remarkable. Source: BrightVolt calculation. BYD Sealion 08: 900 km and a Nine-Minute Charge, Translated · 2026-08-14
Embed code
The spread is enormous, and it depends on which hour the grid is worried about. Source: PJM class ratings; MISO. Capacity Accreditation Explained: Why a 100 MW Wind Farm Counts as 34 MW · 2026-08-14
Embed code
The turbines do not change. The revenue does. Capacity Accreditation Explained: Why a 100 MW Wind Farm Counts as 34 MW · 2026-08-14
Embed code
Nothing about wind got worse. There is simply more of it on the system. Source: PJM ELCC class ratings. Capacity Accreditation Explained: Why a 100 MW Wind Farm Counts as 34 MW · 2026-08-14
Embed code
Whether the headline rate is 102.5% or 127.5% depends entirely on the third bar. Source: US HTS; Section 301. Waymo Is Importing Chinese Robotaxis at Double Price. Here’s Why. · 2026-08-14
Embed code
Even at the higher tariff reading, the Zeekr lands at under half the cost of the Jaguar it replaces. Source: CarNewsChina; Forbes. Waymo Is Importing Chinese Robotaxis at Double Price. Here’s Why. · 2026-08-14
Embed code
The Arizona plant is not a cost decision. It is the exit from a regulatory deadline. Waymo Is Importing Chinese Robotaxis at Double Price. Here’s Why. · 2026-08-14
Embed code
The same month, three ways. Source: CAAM and CPCA, via CnEVPost. The BrightVolt Take: China’s EV Growth Is All Exports Now · 2026-08-13
Embed code
Two official scoreboards, one market. The BrightVolt Take: China’s EV Growth Is All Exports Now · 2026-08-13
Embed code
Domestic sales down ~12%, exports up 120%. Source: CAAM, via CnEVPost; 2025 back-calculated from reported year-on-year changes. The BrightVolt Take: China’s EV Growth Is All Exports Now · 2026-08-13
Embed code
The 2027 milestone and the product are not the same event. Source: CATL and BYD statements, 2026. The BrightVolt Take: Solid-State’s 2027 Is Not a Car · 2026-08-12
Embed code
The payoff is real: roughly 40% more energy per kilogram. The price is the problem. Source: CATL; industry cell figures. The BrightVolt Take: Solid-State’s 2027 Is Not a Car · 2026-08-12
Embed code
Why the first cells go into flagships, not hatchbacks. Source: CATL, via electrive. The BrightVolt Take: Solid-State’s 2027 Is Not a Car · 2026-08-12
Embed code
A scooter swap needs no cable, no robot and no wait. Source: Gogoro. Why Battery Swapping Works for Scooters, Not Cars · 2026-08-12
Embed code
The single number that decides the economics. Source: Gogoro; typical EV pack. Why Battery Swapping Works for Scooters, Not Cars · 2026-08-12
Embed code
Natron tried to out-build sodium’s density problem. Peak designed around it. Source: IEEE Spectrum; Canary Media. US Sodium-Ion Bets on the Grid, Not the Car · 2026-08-12
Embed code
Sodium’s optimistic ceiling lands where LFP already sits. Source: pv magazine; CATL; battery.mba. US Sodium-Ion Bets on the Grid, Not the Car · 2026-08-12
Embed code
Intercalation stores charge; plating deposits metal. The difference is about a tenth of a volt. Lithium Plating: Why Fast Charging Degrades Batteries · 2026-08-10
Embed code
Most fast charges never reach the end of this chain. Design aims to break it at the first link. Lithium Plating: Why Fast Charging Degrades Batteries · 2026-08-10
Embed code
The 5.8 GW RWE walked away from. Source: RWE lease filings via Maritime Executive. The US Is Paying $4 Billion to Cancel Offshore Wind · 2026-08-10
Embed code
The buyback cheque and the gas cheque are the same size. Source: Fortune; Maritime Executive. The US Is Paying $4 Billion to Cancel Offshore Wind · 2026-08-10
Embed code
How the buyback empties the offshore pipeline. Source: US Department of the Interior. The US Is Paying $4 Billion to Cancel Offshore Wind · 2026-08-10
Embed code
What actually comes online in 2026. Gas is 7% of it. Source: EIA Short-Term Energy Outlook, 2026. The BrightVolt Take: Gas Didn’t Win the AI Power Race · 2026-08-07
Embed code
The backlog grows while delivery dates slide to 2031. Source: GE Vernova Q2 2026 results, via Utility Dive. The BrightVolt Take: Gas Didn’t Win the AI Power Race · 2026-08-07
Embed code
Rate and charging time are the same fact stated two ways: time equals one divided by C. What C-Rate Tells You About How Fast an EV Charges · 2026-08-07
Embed code
The headline C-rate is the height of the spike, not the area under the curve. What C-Rate Tells You About How Fast an EV Charges · 2026-08-07
Embed code
How much of the average wholesale price solar earned, April 2026. Source: Pexapark via pv magazine, 13 May 2026. Solar Capture Rate Explained: Why More Solar Earns Less · 2026-08-04
Embed code
The merit-order effect: solar depresses the price in exactly the hours it sells into. Solar Capture Rate Explained: Why More Solar Earns Less · 2026-08-04
Embed code
Heat pumps sold per 1,000 households in 2024, by country The BrightVolt Take: Heat Pumps Sell on the Price Ratio · 2026-08-03
Embed code
European heat pump sales, year-on-year change The BrightVolt Take: Heat Pumps Sell on the Price Ratio · 2026-08-03
Embed code
Combined system output as claimed by each manufacturer. Sources: CnEVPost; CarNewsChina; Denza. 1,113 Horsepower, 185 km of Range, and One of Those Numbers Is CLTC · 2026-08-02
Embed code
CLTC as published, against an EPA-equivalent estimate using the 26% haircut from our range-cycle explainer. The right-hand bars are our arithmetic, not Geely’s. 1,113 Horsepower, 185 km of Range, and One of Those Numbers Is CLTC · 2026-08-02
Embed code
One measured session, January 2026. Source: EV Charging Stations DC fast charging analysis. Why a 350 kW Charger Never Gives You 350 kW · 2026-08-02
Embed code
Amps needed for 350 kW. A CCS plug handles about 500 A continuously. Why a 350 kW Charger Never Gives You 350 kW · 2026-08-02
Embed code
What happens across a session. Sources: evkx.net; World Electric Vehicle Journal, August 2024. Why a 350 kW Charger Never Gives You 350 kW · 2026-08-02
Embed code
The standard against the hardware. Sources: CharIN; Milence; electrive, 30 July 2026. Why a 350 kW Charger Never Gives You 350 kW · 2026-08-02
Embed code
Solar capture factors, April year on year. Source: Pexapark via pv magazine, 13 May 2026. The BrightVolt Take: Europe’s Solar Problem Is Value · 2026-08-02
Embed code
Volume up, value down. Sources: Ember; SolarPower Europe; Kpler; LevelTen Energy. The BrightVolt Take: Europe’s Solar Problem Is Value · 2026-08-02
Embed code
Heavy truck electrification, 2025. Denominators differ by market. Sources: CVWorld via CnEVPost; ACEA; CALSTART. Europe Sold 4,991 Electric Trucks. China Sold 231,100. · 2026-08-02
Embed code
TCO gap against diesel long-haul, 2026. Source: ICCT, April 2026. Europe Sold 4,991 Electric Trucks. China Sold 231,100. · 2026-08-02
Embed code
China’s H1 2026 generation mix. Source: National Energy Administration, 30 July 2026. China’s Coal Share Fell Below Half. Coal Still Grew. · 2026-08-02
Embed code
New solar capacity, first half. Source: National Energy Administration, released 22 July 2026. China’s Coal Share Fell Below Half. Coal Still Grew. · 2026-08-02
Embed code
Yield under panels against open field. Source: Energies 19(2) 539, 2026 systematic review. Agrivoltaics: What 320 Experiments Actually Found · 2026-08-02
Embed code
Capex and electricity yield by mounting type. Source: Energieagentur Rheinland-Pfalz, January 2026. Agrivoltaics: What 320 Experiments Actually Found · 2026-08-02
Embed code
Pumped storage under construction, end 2025. Source: IHA World Hydropower Outlook 2026. The West Licenses Pumped Storage. China Builds It. · 2026-08-02
Embed code
Capital cost per kWh of storage. Fengning and Goldendale derived from published capex; not inflation-harmonised. Sources: State Grid; Rye Development; Lazard LCOE+ June 2025. The West Licenses Pumped Storage. China Builds It. · 2026-08-02
Embed code
Denza Z Coupe pricing, China against the United Kingdom BYD’s Denza Z Costs 88% More in Britain Than China · 2026-08-01
Embed code
Leapmotor B-series range by trim Leapmotor Just Broke the 800V Price Floor · 2026-08-01
Embed code
Battery attachment rate on new residential solar Net Metering Is Ending. Homeowners Are Buying Batteries. · 2026-08-01
Embed code
US residential solar installations by year Net Metering Is Ending. Homeowners Are Buying Batteries. · 2026-08-01
Embed code
The two estimates of California's 2024 rooftop solar cost shift Net Metering Is Ending. Homeowners Are Buying Batteries. · 2026-08-01
Embed code
Gravimetric energy density by cell chemistry Sodium-Ion Batteries: Why They Won’t Replace Lithium · 2026-08-01
Embed code
Sodium-ion against LFP on the attributes that decide deployment Sodium-Ion Batteries: Why They Won’t Replace Lithium · 2026-08-01
Embed code
Announced sodium-ion capacity against what is actually operating Sodium-Ion Batteries: Why They Won’t Replace Lithium · 2026-08-01
Embed code
Battery-grade lithium carbonate, China spot. Sources: Benchmark Mineral Intelligence; Gasgoo; Trading Economics. Sodium-Ion Batteries: Why They Won’t Replace Lithium · 2026-08-01
Embed code
Onshore wind down seven points, four-hour storage up nine. Source: PJM BRA ELCC class ratings, 2026/27 to 2028/29. The BrightVolt Take: Storage Just Overtook Wind on Winter · 2026-08-01
Embed code
PJM’s preliminary class ratings, which the operator labels non-binding and indicative only. Source: PJM. The BrightVolt Take: Storage Just Overtook Wind on Winter · 2026-08-01
Embed code
Onshore turbine prices, West against China The BrightVolt Take: Storage Just Overtook Wind on Winter · 2026-08-01
Embed code
Electric range on the CLTC cycle against usable battery. Sources: CarNewsChina and CnEVPost, 30 July 2026; CnEVPost, 16 July 2026. Xiaomi’s SkyNomad Isn’t Electric, and Isn’t a Brand · 2026-08-01
Embed code
Electric range on the CLTC cycle against usable battery. Sources: CarNewsChina and CnEVPost, 30 July 2026; CnEVPost, 16 July 2026. Solar and Storage Are 79% of New US Grid Capacity in 2026 · 2026-07-31
Embed code
Solar capture factors, April year on year. Source: Pexapark via pv magazine, 13 May 2026. Japan’s First 300km Electric Kei Car Is Chinese · 2026-07-31
Embed code
China’s H1 2026 generation mix. Source: National Energy Administration, 30 July 2026. EV Range Explained: Why CLTC, WLTP and EPA Disagree · 2026-07-30
Embed code
Active capacity in the US interconnection queue by technology, end of 2025 The BrightVolt Take: Solar Isn’t the Bottleneck. The Queue Is. · 2026-07-30
Embed code
Median months from interconnection request to commercial operation, 2008 to 2025 The BrightVolt Take: Solar Isn’t the Bottleneck. The Queue Is. · 2026-07-30
Embed code
Year-over-year change in US battery-electric vehicle sales, Q4 2025 through Q2 2026 US EV Sales Q2 2026: Decline Slows as Hybrids Take Over · 2026-07-30
Embed code
Year-over-year change in US retail sales by powertrain, Q2 2026 US EV Sales Q2 2026: Decline Slows as Hybrids Take Over · 2026-07-30
Embed code